back to references from the sector Public facilities

Expansion and General Refurbishment of the secondary school in Ergolding

Project

Energy efficiency general refurbishment
Etzstraße 2, 84030 Ergolding, Germany

Overview of our operations

Expansion and energy efficiency and fire protection refurbishment

Overview of our operations

Expansion and energy efficiency and fire protection refurbishment

Project description

The Ergolding secondary school project comprised the general refurbishment of the original building as well as a 4-storey extension. The works were carried out during school time. The whole structure stands out due to its both modern and distinctive architecture. The classrooms were given a makeover and are now bright and flooded with natural light. They have also been fitted with new high-quality flooring and acoustic ceilings. The main focus was always to maintain the character of the building.  A restructuring of the buildings has led to optimized use of the school and its grounds. The problem of lack of space in the school office, teachers' staffroom and consultation room as well as the pupil representative's room has thus been solved. The extension contains rooms for school lunches and the existing full-day care room has been fitted out to bring it up to date to meet current standards. The realization of the project also included the installation of a service kitchen with store rooms as well as a delivery area with a goods Elevator.

Contact

Delta ImmoTec GmbH
Bahnhofstraße 15
84144 Geisenhausen
Germany

For further information please contact us via email at info@delta-gruppe.de.

Client

District Authority of Landshut

Specifications

Start of construction
November 2010
Final Completion
March 2012
Ground plan area
2,335 m²
Gross volume
7,648 m³

Delivered Services

Planning
Architecture
Electrical Engineering
Supply Technology
Fire Protection

Technical characteristics/Gallery