Renovation of power and heat supply systems kbo-Isar-Amper-Klinikum, Taufkirchen (Vils)

Project

Renovation of power and heat supply systems
Bräuhausstraße 5, 84416 Taufkirchen (Vils)

Overview of our operations

Renovation of power and heat supply systems

Overview of our operations

Renovation of power and heat supply systems

Project description

Electrical Engineering

  • Decommissioning and partial dismantling of the existing power grid (medium and low voltage)
  • New construction of the power supply from the medium-voltage transfer station of the energy supplier to the main building Distribution
  • Renewal of the medium-voltage transfer station, medium-voltage network, medium-voltage switchgear and transformer stations on the clinic premises
  • Integration of the existing diesel emergency supply with decentralized control and synchronization of  each of the buildings
  • Building automation system with the system architecture according to ISO EN 16484-3 with three levels for the power supply: Management level, automation level (automation stations), field level (field devices)

 

Mechanical Engineering

  • Decommissioning and partial dismantling of existing district heating Pipelines
  • New construction of the district heating network with the associated earthworks
  • Renewal of the district heating transfer stations, heat distribution and hot water processing Systems
  • Installation of water treatment and replenishment in the central heating system

Contact

Delta ImmoTec GmbH
Bahnhofstraße 15
84144 Geisenhausen
Germany

For further information please contact us via email at info@delta-gruppe.de.

Client

Isar-Amper-Klinikum gemeinnützige GmbH
Klinik Taufkirchen

Specifications

Start of construction
March 2016
Final completion
March 2017

Delivered Services

Planning
Electrical Engineering
Supply Technology