Client: DRÄXLMAIER Group
Project duration: 30 months
Gross floor area: 80.000 m²
Production: approx. 45.000 m²
Injection molding: 2.800 m²
Logistics: approx. 12.000 m²
+100,000 tons of concrete
+10,000 tons of steel
+7,000 PV modules
+4,000 LED lights
+400 construction workers
+50 engineers
This project combines progressive architecture and functional design. The carefully planned infrastructure allows a seamless and secure access for numerous employees. We rely on state-of-the-art technologies and sustainable construction methods to create an ideal working environment.
Rapid urbanization in China has led to more frequent urban flooding. The new building law in China therefore requires the construction of so-called "sponge cities", which act as rainwater retention basins and aim to collect and reuse rainwater. In addition, the varying levels of the natural terrain were taken into account so that the floors of the halls as well as the office, technical and social buildings are above street level.