Client: DRÄXLMAIER Group
Start: February 2022
Completion of building: August 2023
Completion of outdoor facilities: March 2024
Gross floor area: 21,000 m²
The project is based on a sustainable concept that focuses on the integration of renewable energies.
The construction of a multi-storey production building in an earthquake zone presented the project with a variety of challenges. The structure had to withstand high loads and cope with large spans, while at the same time complying with strict structural engineering requirements.
To meet these requirements, a deep foundation was built incorporating prestressed TT floor elements. This resulted in a robust structure that is able to withstand the dynamic forces of an earthquake.
The coordination of the various trades was crucial in order to meet the structural requirements and specified parameters.
Overall, the project demonstrates a high level of technical innovation and expertise as well as commitment to providing the highest quality standards and safety in challenging and demanding construction projects.
It was possible to achieve the rather ambitious target of installing the first machines in a functional clean zone within ten months of the start of construction.
In addition, parts of the site could be handed over to the client to begin operations even before construction was completed. This allowed the client to put certain areas into operation earlier than originally planned and thus more quickly gain a return on their investment.
Completing the project within schedule and the flexibility in project execution contributed significantly to the success and satisfaction of all parties involved.