Client: DRÄXLMAIER Group
Start: September 2021
Completion of office building: November 2022
Completion of production: February 2023
Injection moulding production: approx. 5,125 m²
Media bridge: approx. 825 m²
Technical extensions: approx. 100 m²
Office building: approx. 4,375 m²
New construction of an injection moulding production facility with crane system, media bridge with a load capacity of 5t/m² and new technical buildings. The start of the machine installation took place in September 2022.
New construction of the office building. This comprised the ground floor to the 4th floor incl. adjacent outdoor facilities (fire service access, granulate silo facility, etc.)
Conversions in the existing building.
A sustainable concept and the integration of renewable energies formed the basis for this project. For this reason, a photovoltaic system with an output of around 200 kWp was installed on the roof areas of the production and office building, as well as another PV system on the façade of the production building.
With an output of 200 kWp, the system can generate up to 200 kilowatts of electricity under optimal conditions, which corresponds to the average annual electricity consumption of around 50 households.
These measures support the environmentally friendly energy supply of the entire site.
Do you have questions about your project? Or are you about to decide on a building project? We can give you answers to any questions you may have. We always aim to provide innovative solutions to the highest standard.