Client: Dräxlmaier Group
Start: April 2022
Completion: December 2023
Production and logistics area: 23,000m²
With a total of nine bays, it offers a spacious and modern infrastructure. Six of these bays in particular are intended for future HV battery module assembly.
The building is air-conditioned using innovative heat pump technology that meets the highest standards of efficiency, sustainability and technical cleanliness. Seamless integration of building and plant technology completes the overall energy concept. Energy consumption is continuously measured digitally and the energy and process data of the systems are visualized.
In the event of an emergency, a highly complex fire protection system enables rapid detection and automatic firefighting, thus minimizing the risk of fire spreading.